<th id="blbpp"></th>

    <strike id="blbpp"><progress id="blbpp"><ol id="blbpp"></ol></progress></strike>

    <noframes id="blbpp"><cite id="blbpp"><sub id="blbpp"></sub></cite>
      <track id="blbpp"></track>

          <nobr id="blbpp"><form id="blbpp"></form></nobr>
            You are here:Home»Projects»Commercial»Lake Sammamish State Park Docks

            Lake Sammamish State Park Docks

            After years of docks that were too short, too slippery and sometimes underwater, Thornberg Construction completed phase 1 of the Lake Sammamish State Park boat launch improvements that added two much needed floating docks for the Washington State Parks.

            Permits for this project required all in water work to be completed prior to January 1st, 2011. Notice for this project was issued to Thornberg on December 1st and work was completed December 31st, 2010. These ramps were designed to ADA standards and are approximately twenty feet longer than the previous wood docks, allowing more room to launch and retrieve boats.

            Search Projects

            Featured Projects

            ? View all project categories